Our Work

about_imgClick on an item to view pictures of our work

PRI Photo Shoot

Infrared Asphalt Restoration

Using the latest repair technology to get the best and most efficient repair for your money

Infrared repair – repairs potholes, utility cuts, alligator cracking, high spots, rough surfaces
Faster – You can make a repair in as little as 30 minutes
No cold joints – prevents the intrusions of water thus preventing future failures
More Efficient – Less manpower and less equipment
Renews Asphalt – with the application of asphalt rejuvenators we bring new life to old asphalt return of flexibility and adhesion
Environmentally Friendly – with this process we recycle existing asphalt minimizing waste

INFRARED RESTORATION PROCESS STEP BY STEP

  1. CLEAN & MARK OUT REPAIR
  2. LIGHT THE INFRARED HEATER
  3. LOWER HEATER OVER REPAIR
  4. APPLY REJUVENATOR
  5. ADD VIRGIN ASPHALT
  6. LUTE THE ASPHALT SMOOTH
  7. PATCH IS READY TO ROLL
  8. THE EDGES ARE ROLLED FIRST
  9. COMPACTION IS COMPLETED

Fog Sealing Asphalt Pavements

Replay Aquiculture Oil Road Treatment – Polymer Enhanced – Green Product
Replay – 30% soybean based
Cure Time – 20-30 minutes
Clear – Striping no problem does not hide traffic marking
Polymer – contains 15% polymers
Adds Pavement Life – Improves Flexibility & Seals Hairline Cracks
Penetration – Penetrates from 1/2″ to 1 1/2 ” as it softens the asphalt

Pass QB Rejuvenating Cationic Emulsion
Pass QB – Penetrates & Seals Old Asphalt
Pass QB – Rejuvenates & Aesthetically Enhances Asphalt
Pass QB – Prevents Future Degradation inhibiting Raveling, Water Intrusion, and Oxidation
Pass QB – Restores light and Fractions of the asphalt
Pass QB – up to 4 years life extension